Partner Library

TeepTrak Partner Program

The Partner Library. Everything you need to sell TeepTrak.

Brochures, the OEE whitepaper, sector case studies and the full Global Partner Program kit. Available in your language, free for partners and prospective partners.Unlock the library
What is inside

Sales-ready material, not marketing filler.

GP
Gated
KIT

Global Partner Program kit

The full 15-slide deck: the market, the product suite, the three tracks, the five EXPERT levels and the commission model.
EN · FR · DE · ES · NL · RO · ZH · PT
TO
Gated
WHITEPAPER

The OEE whitepaper

How manufacturers find the 30 to 45% of hidden capacity, and what to measure first.
EN · FR · DE · ES · NL · ZH
TP
Gated
BROCHURE

TeepTrak product brochure

The hardware, the six modules and the deployment model, in one document you can forward.
EN · FR · DE · ES · NL · ZH
AC
Gated
CASE STUDY

Automotive case study

How an automotive supplier recovered capacity on a live line, with the numbers.
EN · ES · NL
FA
Gated
CASE STUDY

Food and beverage case study

Changeover time cut and OEE lifted on a packaging line.
FR · DE
EC
Gated
CASE STUDY

Electronics case study

Micro-stop capture and operator qualification on a high-mix line.
EN · FR · DE · ES · NL
MC
Gated
CASE STUDY

Materials case study

Process drift caught before it cost a batch.
EN · FR · DE · ES · NL
JA
Gated
CASE STUDY

Jemba AI case study

What the cleanest shop-floor dataset in the industry predicts.
EN · FR · DE · ES · NL · ZH
CC
Gated
REFERENCES

Client case study pack

The consolidated pack of verified TeepTrak client results.
EN · FR · DE · ES · NL · ZH
Get access

Request the Partner Toolkit

Tell us who you are and we send the kit straight to your inbox, in your language. Your regional manager is copied.

1Fill the form
2Kit arrives by email
3A real person follows up

Request Partner Toolkit

Sales decks, datasheets, ROI calculator, brand assets.

TeepTrak Partners

The partner program of TeepTrak, the plug and play performance platform for smarter factories.

Paris · Chicago · Shenzhen · Bucharest

Partner login

© 2026 TeepTrak. A TeepTrak.com Property.Partner Program home
TeepTrak Partners

Enablement documents

Your core sales toolkit — download and use with prospects. Pricing & API are internal templates.

Watch the product tours →

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.