成功案例

PerfTrak 部署的真实成果——自 2016 年以来已装备 700 多家工厂。

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

客户之声“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

客户之声“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

客户之声“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

合作伙伴的信赖

由咨询公司、集成商和工程公司组成的不断壮大的网络,在全球工厂部署:TeepTrak。