Product Tours

Seven guided product tours — how TeepTrak is configured and how operators use it on the floor. Use them to demo without a live rig: match the tour to the buyer and send the link before a call so they arrive warm.

PLATFORM

Virtual factory configuration

Show it to: Plant / IT lead

Model the real plant — sites, lines, machines — in minutes.

PLATFORM

Product configuration

Show it to: Plant lead

Set products and ideal rates so OEE reflects reality.

PLATFORM

Managerial configuration

Show it to: Operations director

Roles, teams and management views.

PLATFORM

Loss-tree configuration

Show it to: CI / methods

Structure losses the way your client already thinks about them.

OPERATOR TABLET

Report a loss (operator tablet)

Show it to: Operators / floor

Frontline capture in seconds — the heart of the system.

OPERATOR TABLET

Split a loss (operator tablet)

Show it to: Operators / CI

Precise root-causing of a downtime event.

OPERATOR TABLET

Quality-loss management (tablet)

Show it to: Quality / CI

Capture scrap and defects at the source.

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.