Open partner territories – TeepTrak Partner Programme

TeepTrak

Open partner territories

Seven territories are open. We take one or two partner companies in each. Every role below publishes its commission in full, because nobody else in this category does.

Open now

Mexico

Monterrey, Saltillo, Bajío, Puebla, Tijuana, Ciudad Juárez

Ramp fee
MXN 36,000
See the role
Open now

Türkiye

Bursa, Kocaeli, İzmir, Konya, Gaziantep, Denizli

Ramp fee
TRY 75,000
See the role
Open now

Morocco

Tanger, Kénitra, Casablanca, Agadir, Meknès, Fès

Ramp fee
MAD 18,000
See the role
Open now

Poland

Wrocław, Katowice, Poznań, Łódź

Ramp fee
Set in local currency
See the role
Open now

Romania

Timișoara, Arad, Pitești, Craiova, Cluj-Napoca

Ramp fee
Set in local currency
See the role
Open now

Thailand

Rayong, Chonburi, Chachoengsao, Ayutthaya

Ramp fee
Set in local currency
See the role
Open now

Malaysia

Penang, Johor, Klang Valley, Kedah

Ramp fee
Set in local currency
See the role

How a territory works

  • A named lead in your territory in week two. Not a list, a plant and a contact.
  • A loaner demo kit in week one, and TeepTrak in the room for your first deals.
  • 25% off list on subscription, 15% on hardware, and you keep 100% of your own services revenue.
TeepTrak PartnersTeepTrak partner programme. Real time OEE in 460+ factories across 30+ countries.
TeepTrak, 155 Bd Vincent Auriol, 75013 Parisrav@teeptrak.com

Success stories

Real results from PerfTrak deployments — over 150 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.