Contact

Send us a message and we usually reply within one business day. Prefer to talk to a person? Every enquiry reaches a named regional manager, not a ticket queue.

Contact us

Thank you — your message is on its way. We’ll reply within one business day.

Prefer a live demo?

  • A personalised exchange with an expert
  • A walkthrough tailored to your challenges
  • Clear, concrete answers

Book a demo →

Reach a specific team

Our offices around the world

International — four offices across EMEA, the Americas and APAC.

Paris

Headquarters

155 boulevard Vincent Auriol
75013 Paris, France

+33 6 40 63 26 73

Chicago

Sales office

116 W Hubbard St #501
Chicago, IL 60654, USA

+1 312 698 3065

Shenzhen

Sales office

Office 426, Bldg. 2, Xinghui Technology Park, Bao’an, Shenzhen, China

+86 189 4831 0588

Bucharest

Romania office

Bulevardul Iuliu Maniu 6L
061103 Bucharest, Romania

+40 725 973 451

Harness the power of your production

See how TEEPTRAK turns real-time data into measurable performance gains.

Discover our solutions →

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.