2026 OEE Partner Program Guide (Free Download)

Thinking about reselling or referring OEE and production-monitoring software? Get the free 2026 TEEPTRAK Partner Program Guide and see exactly how partners build recurring revenue with real-time OEE — the models, the margins, and how to start.

What is inside the guide

  • The three partner models compared — Business Introducer, Channel Partner, Technology Partner
  • Commission and margin structure, and how recurring subscription revenue compounds
  • The addressable market: why non-intrusive, 24–48h deployment widens who you can sell to
  • What each model requires from you, and how to choose
  • Onboarding, enablement and the tools you get as a partner
  • A step-by-step path from first referral to a book of recurring accounts

Who it is for

Industrial distributors, automation and system integrators, MES/ERP consultants, and manufacturing advisors who want a recurring-revenue product to add to their portfolio in 2026.

Get the guide

Request the guide and a partner manager will send it to you and answer any questions. Choose the track that fits you:

Apply as a Channel Partner →   Become a Business Introducer →   Explore Technology Partnership →

New to reselling OEE software? Start with our guide on how to become an OEE software reseller, then browse the Partner Library.

Free download

Get the 2026 Partner Program Guide

Fill the form: the guide arrives in your inbox in your language and your regional partner manager follows up.

1Fill the form
2Your regional partner manager follows up

Request Partner Toolkit

Sales decks, datasheets, ROI calculator, brand assets.

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TEEPTRAK on factory floors worldwide.