Resources

The full library, downloadable now. Every asset in every language we have it in.

Sales material

Direct downloads. No form, you are already a partner.

KIT
Global Partner Program kit

The full 15-slide deck: market, product suite, the three tracks, the five EXPERT levels and the commission model.

ENFRDEESNLROZHPT
WHITEPAPER
The OEE whitepaper

How manufacturers find the 30 to 45% of hidden capacity, and what to measure first.

ENFRDEESNLZH
BROCHURE
TeepTrak product brochure

The hardware, the six modules and the deployment model. Forward it as is.

ENFRDEESNLZH
REFERENCES
Client case study pack

The consolidated pack of verified TeepTrak client results.

ENFRDEESNLZH

Sector case studies

Bring the one that matches the prospect.

AUTOMOTIVE
Automotive case study

Capacity recovered on a live automotive line, with the numbers.

ENESNL
FOOD AND BEVERAGE
Food and beverage case study

Changeover cut and OEE lifted on a packaging line.

FRDE
ELECTRONICS
Electronics case study

Micro-stop capture and operator qualification on a high-mix line.

ENFRDEESNL
MATERIALS
Materials case study

Process drift caught before it cost a batch.

ENFRDEESNL
AI
Jemba AI case study

What the cleanest shop-floor dataset in the industry predicts.

ENFRDEESNLZH

Need something we do not have?

Co-branded material, a custom deck or MDF for a campaign. Ask your regional manager.

Ask for materialPartner Academy

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.