Partner Academy

Eight modules, real product videos, and the exact material to bring to each meeting. Work through it in order and you can run a discovery call alone.

0 of 8 modules opened

1
Start here: the 5-minute partner briefingEverything the program is, in five minutes.
+

The fastest way in. What TeepTrak sells, who buys it, and how you make money on it.

You will be able to: explain TeepTrak in 60 seconds, name the six modules, and say which partner track fits your business.

Partner kit (EN)Kit partenaire (FR)Partner-Kit (DE)Kit (ES)Kit (NL)Kit (RO)资料包 (ZH)
2
Understand OEE like your prospect doesThe one concept every conversation turns on.
+

OEE is the language of the plant manager. If you cannot hold this conversation, you cannot qualify the deal.

You will be able to: define availability, performance and quality, explain why paper shift logs overstate OEE by 8 to 15 points, and name the hidden 30 to 45% of capacity.

OEE whitepaper (EN)Livre blanc TRS (FR)Whitepaper (DE)Whitepaper (ES)Whitepaper (NL)白皮书 (ZH)
3
The product: PerfTrak and the six modulesWhat you are actually selling.
+

Land with real-time OEE, then expand the account module by module on the same TEEPTRAK Box.

You will be able to: pick the right module for a given pain, and explain the expansion path from PerfTrak to QualTrak, PaceTrak, ProcessTrak, MoniTrak and Jemba.

Product brochure (EN)Brochure (FR)Brochure (DE)Brochure (ES)Brochure (NL)产品手册 (ZH)
4
Win against the MES objectionThe objection that kills most industrial software deals.
+

A traditional MES takes one to two years. This is the comparison that closes the gap.

You will be able to: answer "we already have a MES" without conceding, and position TeepTrak as the fast OEE layer that can feed the MES by API.

Full technical objection handling
5
Build the business case: ROINumbers are what get you the pilot.
+

Most plants surface their first hidden losses within two weeks of the pilot. Here is how to quantify it before you walk in.

You will be able to: build an ROI estimate from machines, hours and cost, and defend a conservative +8 to +10 OEE point assumption.

Client case pack (EN)Etudes de cas (FR)Fallstudien (DE)Casos (ES)Cases (NL)案例 (ZH)
6
Sector proof: bring the right case studyNever walk in with a generic deck.
+

Match the case study to the prospect sector. Automotive, food and beverage, electronics or materials.

Automotive

ENESNL

Food and beverage

FRDE

Electronics

ENFRDEESNL

Materials

ENFRDEESNL

Jemba, the AI layer

ENFRDEESNLZH
7
Installation reality checkWhat the engineer actually does on site.
+

Under one hour per machine, no PLC changes, no production stoppage. Watch it happen so you can promise it with a straight face.

You will be able to: describe the install to a sceptical maintenance manager, and answer the electrician and downtime questions.

8
Why 50+ partners chose TeepTrakThe peer argument.
+

What the partners already selling this say about the margin, the sales cycle and the support.

You will be able to: use the partner network as proof in your own pitch.

Formal certification

The Academy courses issue the TeepTrak partner certification. Certification is funded by TeepTrak for Channel Partners.

Take the certificationTechnical specifications

Success stories

Real results from PerfTrak deployments — over 700 plants equipped since 2016.

MATERIALSROI < 1 month
47% → 72%
OEE in 3 months
Rubber processing — automotive & aerospace supplier

Understanding the major performance losses made PerfTrak profitable within three months.

ELECTRONICSROI < 1 year
+29%
output per hour
Wire-crimping line

Reliable downtime data turned months of stalled improvement into measurable gains.

In their words“We noted a 29% increase in production volume of pieces per hour after installing PerfTrak on a single machine — more than €19k/year on this item.”C.M. Ropiot, Production & Maintenance Manager
OPTICSROI < 1 month
75% → 85%
OEE, +10 points
World leader in corrective lenses (China)

Format-changeover times are now timed and cut; the solution is deployed across several plants.

AUTOMOTIVEROI < 1 year
90 machines
connected in weeks
PSA Caen

40 real-time dashboards installed; local teams trained in 3 days to deploy the rest autonomously.

In their words“The PerfTrak systems are already cost-effective given the time freed up for operators, now focused on value-added tasks rather than data collection.”Christophe Pasquet, Factory of the Future, PSA Caen
FOODROI < 1 month
22 + 7
PerfTrak + MoniTrak units
Nutriset

Fighting malnutrition since 2016 — manual reporting replaced, productivity up, costs stabilised.

In their words“The ROI at Nutriset has been very rapid — we eliminated the small 3–4 second downtimes that happen fifty or a hundred times a day.”Sylvain Clausse, Maintenance & Automation, Nutriset

Trusted by our partners

A growing network of consultants, integrators and engineering firms deploying TeepTrak on factory floors worldwide.